Construction Site Of East Boston Tunnel 1961

Construction Site Of East Boston Tunnel 1961

Inside the construction site of the second East Boston tunnel, later known as the Callahan Tunnel, on May 19, 1960. The tunnel opened in November 1961, and was the second vehicular tunnel constructed under the Mystic River.

Louis Russo

from 59.00
Size / Frame:
Quantity:
Add To Cart